Find published dossiers by topic, company, product or technology.

Showing 61–80 of 300 dossiers

Meta Muse turns a consumer AI assistant into a persistent agent — and its first Mac zero-day tests the containment model

Muse packages persistent autonomous execution, credentials, payments, app access and memory into a mainstream consumer product. A September macOS hotfix now provides an early real-world lesson: agent containment has to protect not only the cloud runtime but also the local control path into the agent.

Vercel Agent is bringing production investigations and approved actions into Slack

Vercel Agent now works in Slack as well as the Vercel dashboard, combining logs, metrics, deployments and repository context with team conversation before proposing approved actions such as pull requests, rollbacks, configuration changes and cache purges.

AWS Lambda can now reference deployment packages directly from your S3 bucket

AWS has added a `REFERENCE` mode for Lambda deployment packages. It eliminates duplicate managed copies, raises the default managed-storage quota to 300GB, and gives teams direct control over encryption, lifecycle and audit policy—but a deleted or inaccessible source object can now make a function inactive.

Docker Desktop is replacing its third-party VM layer with Docker VMM

Docker VMM gives Docker direct control over Desktop’s hidden Linux-VM layer and is still targeted to become the default for new installs at GA. The August 24 Desktop 4.88 release is an important beta signal: it fixes a severe inbound-network-throughput regression and removes a 28 GiB Mac memory ceiling, reinforcing the need for workload-specific testing before standardisation.

Google Cloud opens an agent-ready device farm for mobile testing

Google Cloud’s Developer Device Platform is now in public preview with remote physical-device streaming, parallel emulator testing, smart sharding and an agent skill that can drive multi-step journeys, inspect visual issues and feed fixes back into coding agents. It is billed per active device minute and remains a pre-GA service.